New construction of a six-story, 42,000-sf, mixed use, mass-timber structure built on a two-level concrete basement. The Village SF project will create a physical, service, cultural and spiritual nexus for urban American Indians that will ensure the well-being of the community seven generations from now. Programming for each of the floors is as follows: basement level – recreation and support spaces, first floor – cultural center and gathering space, second floor – youth center and office space, third floor – dental clinic, fourth floor – medical and behavioral clinic, fifth floor – transitional housing, and sixth floor – women’s lodge. The rooftop space and ground floor courtyard will provide gardens and outdoor space.

Status: Early Design-Assist Mechanical, Electrical, Plumbing, Design-Build Shoring, Mass Timber, Rough Carpentry, Fire Sprinklers, Structural Concrete, and Dry Site Utilities bid out in March 2024, pending Client approval to award. Client had been working to secure funding, so project was on hold. The Joint Trench construction did commence in October 2023. The GMP FOR REMAINING TRADES is currently bidding with a Bid Due Date of April 26, 2024. Construction is expected to start early Q4 2024 for a 22-month duration.