SUNNYDALE BLOCK 7 – SAN FRANCISCO

This is a joint venture project with Guzman Construction Group. Located in the Sunnydale HOPE SF Special Use District, Block 7 is new construction of a 5-story affordable housing building: 3 and 4 stories of Type VA construction over one story of Type 1 construction. The 137,142 square foot building will contain 89 dwelling units along with residential common spaces including Lobbies, Mailroom, Management and Support Services Offices, Shared Laundry Room, Resident Community Lounge and Deck, a secure landscaped podium level courtyard, and secure bicycle and vehicular parking.

Status: All remaining trades bid out in December 2024 and are pending award confirmation. Construction expected to begin June 2025 for a 19-month duration.

SUNNYDALE BLOCK 9 – SAN FRANCISCO

This is a joint venture project with Guzman Construction Group. Located in the Sunnydale HOPE SF Special Use District, Block 9 will be new construction of a building, five stories of Type VA over Type 1A garage. The 153,162 gsf building will contain 95 dwelling units (1 through 4-bedroom units) for low-income families along with residential common spaces including a double height Lobby, Management and Resident Services Office, Shared Laundry Room, Resident Community Lounge, two Courtyards, and Secure Bicycle (100 spaces) and Vehicular Parking (71 spaces).  Project will commit to being GreenPoint Rated and will be all electric.

Status: All remaining trades bid out in December 2024 and are pending award confirmation. Construction expected to begin between April and June 2025. Duration will be 20.5 months.

WILDCARE – SAN RAFAEL

The project includes the demolition of all non-historic buildings, structures, and caging on the existing WildCare property, the relocation and restoration of the historic Terwilliger building and construction of new three-story building and caging on the existing site. The project replaces existing outdated, undersized facilities with new, code compliant animal hospital, educational, and animal housing facilities. The project also includes replacement of the existing pedestrian bridge over San Rafael Creek, along with creek mitigation as required along the section of creek fronting the property.

Status: All remaining trades bid out in December 2024 and are pending award confirmation. Construction scheduled for March 2025 for a 15.5-month duration.

160 FREELON – SAN FRANCISCO

This is a joint venture project with Guzman Construction Group. New construction of a nine-story, 102,000 gsf family housing building. The all Type I concrete structure will be 85-units: a mix of studio and up to 3-bedroom units. The ground floor includes a main lobby, offices, a multipurpose room, bicycle parking, and building services. No vehicle parking is included.

Status: All remaining trades bid out in December 2024 and are pending award confirmation. Construction expected to begin Q2 2025 in current schedule for a 22-month duration.