This project is a Cahill/Guzman joint venture. Located directly adjacent to the 16th Street BART station, this 2-3 phase affordable permanent support housing project will consist of approximately 400 units. Design concepts are still being flushed out, but it will likely be a mix of high-rise and mid-rise buildings, 9 to 16 stories. Building 1, which will be a 9-story, type-1A with 136 units, bid out in September 2025. Building 2 design concepts will take shape during the schematic phase.

Status: Building 2 Schematic Design review expected Q4 2025. Final GMP bid not likely to occur before September 2026 and construction currently estimated to begin January 2027.