1979 MISSION STREET – PHASE 1 – SAN FRANCISCO – #586
This project is a Cahill/Guzman joint venture. Located directly adjacent to the 16th Street BART station, this 2-3 phase project will consist of approximately 400 units. Design concepts are still being flushed out, but it will likely be a mix of high-rise and mid-rise buildings, 9 to 16 stories. Building 1 – La Maravilla (2970 16th Street) will be a 9-story, type-1A, 100% affordable Permanent Supportive Housing building with 136 units. The ground floor will house resident services offices, shared common areas, a wellness clinic (TI space), and a secure outdoor courtyard. A second floor will provide a community laundry room and terrace and residential units.
Status: All trades for Phase 1 (La Maravilla) bid out in September 2025 and are pending Owner’s review and award. Construction expected December 2025 for a 22-month duration.