TREASURE ISLAND PARCEL IC4.3 – MULTI-FAMILY – #579
New construction of a 219,00 gsf, 150-unit multi-family affordable housing development. The structure is composed of five levels of Type IIA or IIIA load bearing metal stud framing over one level of Type I concrete. Construction type is still to be determined.
Status: Four (4) early trades have already bid out and been awarded: Design-Assist Structural Metal Framing, Exterior Building Maintenance, Elevators, and Fire Sprinkler. 50% CD budget is expected to occur in late September 2025. Final GMP is slated for Q2 2026 with a tentative construction start of Q4 2026.