BALBOA RESERVOIR BLOCK F – SAN FRANCISCO – #561

New construction of a seven-story, 190,000 gsf, 159-unit educator housing development, including a basement. Building will be seven Type I levels. The ground floor includes a main lobby, co-working spaces, fitness, offices, bike parking, dog wash, maker space etc. The basement garage provides public and residential parking, partially in mechanized lifts. The upper floors contain a mix of studio up to 3-bedroom residential units.

Status: Structural Concrete scope bid out as an early trade. This project has been delayed indefinitely. No new timeline provided.

87 EAST EVELYN – MOUNTAIN VIEW – #575 & #576

The site includes two buildings that will be phased construction. The West Building will be constructed first to provide parking for the residence, which is a 7-story building over basement/parking, 161 units, and approx. 220,730 g.s.f. The East Building will be a 12-story high-rise building, likely mass timber, 107 units, and approx. 126,500 g.s.f. The overall duration will be 36 – 42 months of construction, depending on the overlap of construction between phases.

Status: SD budgeting scheduled to occur Q4 2025, and bidding tentatively expected Q2/Q3 2026 for the East Building and Q3/Q4 2026 for the West Building.

3485 CESAR CHAVEZ – SAN FRANCISCO – #563

New construction of a residential building with five stories of Type IIIA construction (63,359 SF) over two stories of Type IA construction (23,249 SF). The ground floor will include residential service areas and common spaces, while the upper floors will house 126 residential units, consisting of 66 studios and 60 one-bedroom units.

Status: 100% Design Development budget took place in March 2025. CD stage expected Q4 2025. Construction start date anticipated for June 2026 for 21 months.