750 GOLDEN GATE – SAN FRANCISCO

This is a sister project to 850 Turk. The site will be built in two phases, together providing construction of a 171-unit, 8-story Type I, affordable family housing development. Construction includes the demolition of an existing parking lot. The building will include common areas and amenity spaces at the first floor. Phase 2 is expected to start one year after phase 1 begins.

Status: Design Development Estimate took place in March 2024. Select early bid trades (Elevator, Fire Sprinkler, Photovoltaics, and Tower Crane) bid out in April 2024. GMP for remaining trades is slated for August 2024. Phase 1 Construction is expected to commence by December 15, 2024.

HUNTERS VIEW PARK – SAN FRANCISCO

This is a Cahill/Nibbi joint venture. A new park in the Hunters View area of San Francisco between two new affordable housing projects we are currently building, Blocks 14 & 17. Work includes landscaping & irrigation, site furnishings such as playground equipment, earthwork, fencing, site concrete, paving, and drainage.

Status: Budgeting now and scheduled to bid this August with construction beginning in Q4 2024 / Q1 2025.

WILDCARE – SAN RAFAEL

The project includes the demolition of all non-historic buildings, structures, and caging on the existing WildCare property, the relocation and restoration of the historic Terwilliger building and construction of new three-story building and caging on the existing site. The project replaces existing outdated, undersized facilities with new, code compliant animal hospital, educational, and animal housing facilities. The project also includes replacement of the existing pedestrian bridge over San Rafael Creek, along with creek mitigation as required along the section of creek fronting the property.

Status: Early Design-Build trades (Foundation Anchors and Piles, Demolition & Building Moving, Steel Bridge, Sprinkler, and Elevators) bid out in January 2024. GMP expected Q3/Q4 2024, with construction tentatively scheduled for Q1 2025. Construction duration is expected to be about 14 months.