SUNNYDALE BLOCK 7 – SAN FRANCISCO

This is a joint venture project with Guzman Construction. Located in the Sunnydale HOPE SF Special Use District, Block 7 is new construction of a 5-story affordable housing building: 3 and 4 stories of Type VA construction over one story of Type 1 construction. The 137,142 square foot building will contain 89 dwelling units along with residential common spaces including Lobbies, Mailroom, Management and Support Services Offices, Shared Laundry Room, Resident Community Lounge and Deck, a secure landscaped podium level courtyard, and secure bicycle and vehicular parking.

Status: Subcontractors were selected for Fire Sprinkler and Solar PV scopes during an early bid. Shoring bid is pending due to proposed existing site condition changes. Bid for Selective Trades (Concrete, Rough Carpentry, Plumbing, HVAC, and Electrical) is scheduled for October 2024, with remaining trades expected to bid out December 2024 or January 2025.

SUNNYDALE BLOCK 9 – SAN FRANCISCO

This is a joint venture project with Guzman Construction. Located in the Sunnydale HOPE SF Special Use District, Block 9 will be new construction of a building, five stories of Type VA over Type 1A garage. The 153,162 gsf building will contain 95 dwelling units (1 through 4-bedroom units) for low-income families along with residential common spaces including a double height Lobby, Management and Resident Services Office, Shared Laundry Room, Resident Community Lounge, two Courtyards, and Secure Bicycle (100 spaces) and Vehicular Parking (71 spaces).  Project will commit to being GreenPoint Rated and will be all electric.

Status: Subcontractors were selected during an early bid for Fire Sprinkler, Elevator, Tower Crane and Photovoltaics scopes. Shoring bid is pending due to proposed existing site condition changes. Bid for Selective Trades (Concrete, Rough Carpentry, Plumbing, HVAC, and Electrical) is scheduled for October 2024, with the remaining trades projected to bid December 2024 or January 2025.

HUNTERS VIEW PARK – SAN FRANCISCO

This is a joint venture with Nibbi Brothers Construction. This new park will be nestled between the two Cahill/Nibbi joint venture projects currently underway (new affordable housing buildings, Blocks 14 & 17, in the Hunters View area of San Francisco). The park will include landscaping & irrigation, site furnishings such as playground equipment, earthwork, site concrete, paving, lighting, fencing, and drainage.

Status: GMP bidding scheduled for this October/November with construction beginning in Q1 2025 for about 8 months.

WILDCARE – SAN RAFAEL

The project includes the demolition of all non-historic buildings, structures, and caging on the existing WildCare property, the relocation and restoration of the historic Terwilliger building and construction of new three-story building and caging on the existing site. The project replaces existing outdated, undersized facilities with new, code compliant animal hospital, educational, and animal housing facilities. The project also includes replacement of the existing pedestrian bridge over San Rafael Creek, along with creek mitigation as required along the section of creek fronting the property.

Status: Early Trades (Deep Foundations, Fire Sprinkler, and Elevators) have been awarded. GMP expected November 1, 2024, with construction tentatively scheduled for Q1 2025. Construction duration is expected to be about 14 months.

160 FREELON – SAN FRANCISCO

This is a joint venture project with Guzman Construction. New construction of a nine-story, 102,000 gsf family housing building. The all Type I concrete structure will be 85-units: a mix of studio and up to 3-bedroom units. The ground floor includes a main lobby, offices, a multipurpose room, bicycle parking, and building services. No vehicle parking is included.

Status: Five early design-build trades bid out in October 2022 and May 2023: Auger Cast Piles, Exterior Building Maintenance, Fire Sprinklers, Solar PV, and Tower Crane. Early trade MEPs, Structural Concrete, Earthwork, Elevator, Shoring, Joint Trench & Temporary Power set to bid in Q4 2024 and GMP for the balance of the trades is estimated to take place Q1 2025. Construction expected to begin Q2 2025 in current schedule for a 22-month duration.